Hotel Complex
Hotel extension including conferencing facilities, administration Offices, carpark/landscape lighting and surveillance
|
|
A Design and Build Project submitted for tender, based on performance
specification to the Clients outline.
The specific requirements under the design were the Atrium lighting installation
and the Associated Sunken Lounge lighting installation.
The project involved the design of the mains distribution, small power, general / emerghency lighting and modifications to the existing fire detection systems.
3 Hodnell Drive
Southam, Warwickshire
CV47 1GQ England
Contact us:
0044-1926-811046
0044-121-2882011